Zig Zagger takes the familiar marble-run format and turns it sideways. Instead of a straight drop, marbles are launched through a switchback of laser-cut ramps, redirected by pivoting gates, and lifted back to the top by a hand-cranked paddle system.
This is a deep build. 6 to 7 hours of careful gear alignment and test runs, and the highest difficulty in the range. For the builder who wants to be challenged.
Choosing a selection results in a full page refresh.
Opens in a new window.
Thanks for subscribing
From now you will receive special offers every week